Description
Wall Type Indicator Post
Technical Specifications:
• Upload the upper cover of control lead
• Measure control lead depth, remove the excess part of connector lead and driving rod
• Fit the control rod with full closed valve, turn the positioning plate to SHUT position
• Load upper cover